Back to the Epic System
04 / Service

Panel Upgrades.

200A and 400A service, swaps, generator-ready.

Old fuse boxes, Federal Pacific recalls, undersized 100A services. We coordinate with PGE or Pacific Power for the disconnect, swap the panel and meter base, and get inspected the same day — power back on by evening in most cases.

Power restored same-day
1day
What's Included

Scope of work.

  • 01

    200A / 400A service

    New main breaker, meter base, riser, and grounding to current code.

  • 02

    Main panel swap

    Eaton, Square D QO, Siemens — like-for-like or upsize as needed.

  • 03

    Sub-panels

    ADU, shop, garage, basement suite — sized for current and future load.

  • 04

    Generator transfer

    Manual or automatic transfer switch, generator-ready interlocks.

Related Project

Oregon City Project

Full trim-out, under-cabinet, landscape and street lighting, Cadet heaters, illuminated mirrors.

View case study
Location
Oregon City, OR
Year
2024 – Ongoing
Category
Panel Upgrades
Start a Panel Upgrades Project

Ready when you are.