Back to the Epic System
04 / Service
Panel Upgrades.
200A and 400A service, swaps, generator-ready.
Old fuse boxes, Federal Pacific recalls, undersized 100A services. We coordinate with PGE or Pacific Power for the disconnect, swap the panel and meter base, and get inspected the same day — power back on by evening in most cases.
Power restored same-day
1day
What's Included
Scope of work.
- 01
200A / 400A service
New main breaker, meter base, riser, and grounding to current code.
- 02
Main panel swap
Eaton, Square D QO, Siemens — like-for-like or upsize as needed.
- 03
Sub-panels
ADU, shop, garage, basement suite — sized for current and future load.
- 04
Generator transfer
Manual or automatic transfer switch, generator-ready interlocks.
Related Project
Oregon City Project
Full trim-out, under-cabinet, landscape and street lighting, Cadet heaters, illuminated mirrors.
View case study- Location
- Oregon City, OR
- Year
- 2024 – Ongoing
- Category
- Panel Upgrades
