How we work.

01
Owner-facingOwner

First call

You call or write. A licensed electrician — not a salesperson — picks up. We ask what's going on, what you've already tried, and what the deadline looks like. If it's an emergency, we treat it that way and get a truck moving.

Deliverables
  • Initial scope conversation
  • Honest assessment of urgency
  • Site visit scheduled if needed
1 / 6
02
Duration30–60 min
Owner-facingLead electrician

Site walk

We come out, look at the panel, measure the runs, and ask questions about how you actually use the space. If the job is small and obvious, we'll quote it on the spot. If it needs design, we say what we need to put a real number together.

Deliverables
  • Existing-conditions photos
  • Load assessment
  • Scope outline by hand
2 / 6
03
DurationDetailed SOW + pricing
Owner-facingEstimator + lead

Estimate

Your estimate includes a detailed scope of work (SOW) and itemized pricing, written in plain language: what we'll do, what we won't, what's owner-furnished, what the permits cost, and what could change the price (and by how much). Line items, not lump sums. No mystery markup.

Deliverables
  • Detailed scope of work (SOW)
  • Itemized pricing
  • Material allowances called out
  • Schedule window
  • Permit and inspection fees
3 / 6
04
Duration1–2 weeks out
Owner-facingProject lead

Mobilize

Permit pulled in your name. Long-lead material ordered. Crew assigned and introduced — you'll know the names and faces walking through your door. We confirm the start date 48 hours ahead and send a parking, access, and utility-disconnect plan.

Deliverables
  • Permit on file
  • Material staged
  • Crew introductions sent
  • Pre-start checklist confirmed
4 / 6
05
DurationPer scope
Owner-facingCrew + lead daily

Execute

We work clean. Drop cloths, daily sweep, labeled circuits as we go. The lead is on site or one call away every day. Daily photo log goes to the owner — you see progress without needing to drop by. Changes get a written change order before any extra work happens.

Deliverables
  • Daily photo update
  • Labeled panel schedule
  • Change orders in writing only
  • Inspection coordinated
5 / 6
06
Duration1 day
Owner-facingLead + owner

Closeout

Final walk with the owner. Panel schedule printed and left in the electrical room. Red-lined as-builts delivered as PDF. Warranty card signed: 2 years on labor, full manufacturer on parts. We pick up the permit close-out so you don't get a letter from the city six months later.

Deliverables
  • Owner walkthrough
  • As-built PDF
  • Printed panel schedule
  • Warranty + permit close
6 / 6
Start at 01

Tell us what's going on.

The first call is a real conversation with a licensed electrician. No form gatekeeping, no callback queue.