Op Connect
Commercial · 2024
Case Study

Op Connect

Project Metrics
EV testing stations
20ct
DC fast charger
200kW
Three-phase transformer
112kVA
240V three-phase panelboard
400A
Summary

20 EV testing stations and a 200 kW DC fast charger, powered by a new 112 kVA three-phase transformer and 400A panelboard, plus alarm, security access and cameras.

Location
Portland, OR
Year
2024
Client
Op Connect
Category
Commercial
Gallery
  • 01 · Open floor, ready for the testing stations.

  • 02 · Conduit runs overhead.

  • 03 · Lighting and conduit at the ceiling.

  • 04 · Storage bay.

  • 05 · Panelboard installation at Op Connect.